www.rp.pl · November 4, 2026
A2 Warsaw–Łódź widening begins at 1.3 bn zloty, with years of roadworks ahead
On 4 November the road agency GDDKiA hands the construction site to Strabag and Budimex. An extra lane is to be added along 92 km of the A2 between late 2027 and April 2028, with average-speed cameras and a 70 km/h limit. The A4 and A1 are next in line for widening.