forsal.pl · November 6, 2026
A2 Warsaw–Łódź widening: two years of roadworks and a 70 km/h limit
Work has begun on widening a 92-kilometre stretch of the A2 motorway between Warsaw and Łódź, at a cost of PLN 1.3 billion. For about two years drivers will keep two lanes in each direction, but with a 70 km/h limit and average-speed cameras. The A4 and A1 are next in line; widening the A4 could cost up to PLN 10 billion.